Drawings and spec in — Elmhurst-ready SAP XML out.
Specvo reads UK planning PDFs, DWGs and specifications, then produces a ready-to-review SAP 10.2 XML that imports directly into Elmhurst. You keep the judgement. We drop the measuring.
Projects
- Grove Rd plot 4
- Grove Rd plot 3
- Millfield phase 2
- Barn Lane semi
Plot 4, Grove Road
Materials check
Floor area
128.4 m²
Heat loss perimeter
38.2 m
External walls
Build-up matchedWT-A
Built on how OCDEAs actually work
SAP assessors lose hours to measuring and chasing developers for missing details. Specvo does both — and hands the file back with every gap flagged.
Vector-first extraction
80% of UK planning PDFs have extractable vector geometry. We read rooms, walls and openings to the millimetre — not pixel guesses.
Catches missing details before you run
Three tiers: hard blockers, SAP defaults, and quality improvements. Each missing item gets an auto-drafted email back to the client.
XML that Elmhurst accepts
Value-level equivalence with Elmhurst Design SAP 10. Import the XML, review, submit — our generated file is round-trip validated.
Four steps, not four afternoons
01
Upload the pack
PDFs, DWG, NBS spec, U-value calcs — drag them in.
02
Materials check
We flag missing details before you waste time running.
03
Review fields
Confidence-scored fields with links back to the source page.
04
Export XML
Drop straight into Elmhurst Design SAP 10.
See it run on a real OCDEA project
Bristol detached bungalow · 59 m² · cavity wall + insulated ceiling. Validated against the official Elmhurst SAP 10 round-trip.
STEP 01
Drop your project files
Floor plans, elevations, spec, U-value calcs. We use Task 5 — a real bungalow in Bristol — as the live tour.
Drag PDFs, DWGs, spec docs here
or click to browse
Real Task 5 file pack — 55 St Marks, BS10 6TS · Bristol
Validated against 5 real OCDEA assessments
Task 5
Bungalow · Detached
Bristol
Task 6
Bungalow · SemiDetached
Sheffield
Task 7
Flat · SemiDetached
UK
Task 8
House · Detached
UK
Task 9
House · SemiDetached
UK
Ready to shave 60% off your next assessment?
Sign in to start a project. We’ll walk you through uploading materials and running the first intake.
SAP 10.3 + FHS 2025 support — Q3 2026.